+44(0) 1926 744771 office@gtechsurveys.com
Select Page
Planning Support (ES / EIA, S73, S106 and LPA requirements), Pre / Post-Construction TV, Radio, TETRA (Airwave) and Mobile Phone Signal Surveys to support Planning Application Submissions and Developer Due Diligence
 
Contact us on 01926 744771 to discuss your requirements
 
Old Kent Road Schemes – London Borough of Southwark
 
Avanton and GL Hearn Limited – ES and EIA Telecommunications chapter production for the Ruby Triangle Scheme on the Old Kent Road, London (Southwark)
 
Berkeley Group – TV, radio and telecommunications impact assessments for the Malt Street Redevelopment, Old Kent Road, London (Southwark)
 
Savills and Ramboll – TV, radio and telecommunications impact assessments for the Cantium Retail Park redevelopment, Old Kent Road, London (Southwark)
 
Tailored Living Solutions Ltd – Post-construction TV, radio and telecommunications impact to discharge a related planning condition for the 67 Southwark Street development, London (Southwark)
 
DP9 and CBRE – TV, radio and telecommunications impact assessments for the development at 596-608 Old Kent Road and Land at Livesey Place, Old Kent Road, London (Southwark)
Other London Schemes
 
Mount Anvil – Tv and radio reception surveys and reporting for The Silk District, Whitechapel E1 development, London (Tower Hamlets)
 
Westfields Construction – TV reception surveys to support the planning application for 56 Shepherd’s Bush, London (LBHF)
 
Kitewood Development Projects Limited – TV and radio reception surveys to support the Creekside Village East EIA submission, London (Greenwich and Lewisham)
 
St. Modwen – Television, radio and telecommunications reception impact assessments and reports to support the Leegate Shopping Centre redevelopment in Lee Green, London (Lewisham)
 
Higgins Group – Post-construction TV and radio surveys for the completed 2-12 High Street Stratford development, London (Newham)
 
Croydon Schemes
 
Crystal Palace Football Club (CPFC) – TV, radio and telecommunications impact assessments to support the proposed Selhurst Park Stadium redevelopment
 
Brick by Brick Croydon Limited – TV, radio and telecommunications impact assessments to support a planning application for the proposed Addiscombe Grove development. We are now the Croydon Council Approved supplier for all matters relating to construction / planning and TV, radio and telecommunicationsread more here
 
Brick by Brick Croydon Limited – TV and radio surveys and impact assessments for the proposed Lion Green Road scheme in Croydon
 
Manchester Schemes
 
 
Alumno Student Developments Limited – Pre-construction TV signal survey and reports to support the Church Inn application, Manchester
 
Ask Real Estate and Deloitte – Pre-construction TV signal survey and report to support the First Street Plot 9a application, Manchester
 
Student Castle and GMS (Parking) Limited – Pre-construction TV signal survey and report to support the Great Marlborough Street application, Manchester
 
Cable Swan Limited (Consisting of Sir Robert McAlpine, Britannia Group, Prime Developers, and Foundation Real Estate) – TV reception surveys and reports for the SimpsonHaugh-designed development on the site of Swan House, which sits on the corner of Swan Street and Rochdale Road, Manchester
 
Qbic Hotels – Pre-construction TV signal survey and report to support the John Dalton House planning application, Manchester
 
60 Oldham Street Limited – Pre-construction television signal survey and report to support the Oldham Street application, Manchester
 
TitleDeed Limited – Pre-construction TV signal survey and report to support a Spear Street development application, Manchester
 
Other UK Projects
 
Torsion Group – Television and radio reception survey and report to support the planning application for the Former Nautical Club redevelopment, Birmingham
 
Creatability Limited – TV and radio reception survey and reports to support the planning application for the Newquay Trampoline Park, Newquay
 
Creatability Limited – Television and radio reception survey and reports to support the planning application for the King George Playing Fields development in Brentford
Wind Energy Planning Support (ES/EIA, S106 and LPA requirements) – Pre and Post-Construction TV, Radio, Telecommunication (microwave and fixed radio links) and Mobile Phone Signal Surveys and Reception Impact Assessments
 
Natural Power and Brenig Wind Farm – Telecommunications impact assessments for the Brenig Wind Farm development, Wales
 
Energia – Pre-construction TV signal surveys and reception impact assessments for the Long Mount, Glenbuck and Eshmore Wind Farms, County Antrim, Northern Ireland
 
Energia – Pre-construction TV signal surveys and reception impact assessments for the Altamuskin and Gortinbar Wind Farms, County Tyrone, Northern Ireland

 

Energia – Pre-construction TV signal survey and reception impact assessment for the Rathsherry Wind Farm, Northern Ireland
 

SSE Renewables – 2G and 3G mobile phone signal surveys and FWALA survey work and reception impact assessments for the proposed Leanamore Wind Farm, Ireland. Leanamore Wind Farm in County Kerry has a permitted export capacity of 18MW, enough to power over 10,000 homes with renewable energy, while offsetting around 16,500 tonnes of harmful CO2 emissions every year

 

SSE Renewables – TV reception survey work and interference assessments for the Galway Wind Park, Ireland. The 174MW Galway Wind Park, co-developed by SSE and Coillte in Connemara’s Cloosh Valley, is Ireland’s largest and best performing wind farm, generating more green energy than any other wind generation site on the island

Radio Frequency (RF), TV and Radio Interference Investigations

RES Group – TV interference investigations in Stanhope relating to the operational Jack’s Lane Wind Farm

 

2G (GSM / GPRS), 3G (UMTS) and 4G (LTE) Mobile Phone Signal Surveys
 
The Royal Parks – 2G, 3G and 4G surveys to assess communications access in Richmond and Bushy Parks. This work was required to determine if wireless car park payment meters would operate correctly
 
FARR Engineering – 2G, 3G and 4G mobile phone signal survey and coverage assessments in the new Croxley Business Park Building 1 development, Watford
 
NHS Trust East Lancashire Hospitals 4G mobile phone signal surveys in critical areas of the Royal Blackburn Hospital to determine if 4G services could provide an alternative backup over NHS IT systems should their systems fail.

Total E&P3G (UMTS) and 4G (LTE) mobile phone signal surveys for the completed Shetland Gas Plant, Shetland Isles, Scotland. The work was undertaken to determine if 3G and 4G services were available in plant critical locations. Particular attention was paid to reception conditions around the MEG processing plant where Total plans to operate a robot for essential repairs. The mono-ethylene glycol (MEG) regeneration and recycling unit was built to reuse the MEG that is injected into the Laggan-Tormore flowlines to prevent possible blockage due to cold climatic conditions.

Bowmer & Kirkland2G, 3G and 4G mobile phone signal surveys for the completed Tara House development in Liverpool. The work was undertaken to determine if a distributed antenna system (DAS) was required to ensure good coverage throughout the structure.

Berkeley Group – 2G, 3G and 4G mobile phone network surveys for the completed Kidbrooke Block D development, Kidbrooke Village, London (Greenwich)

Radio Signal Monitoring, RF Survey Support, RF Signal Measurement Campaigns and RF Drive Testing

Hoare Lea – Baseline / pre-construction RF surveys (TV, DAB and FM radio broadcast services) for the proposed Cairo Place development, London (Croydon)

Hoare Lea – Baseline / pre-construction RF surveys (TV, DAB and FM radio broadcast services) for the proposed Northern Retail Quarter, Reading

Hoare Lea – Baseline / pre-construction RF surveys (TV, DAB and FM radio broadcast services) for the proposed Riverwalk House development, London (Westminster)

Recently Completed Projects


Deliotte, Manchester Quays Limited and Allied London – TV, radio and mobile phone network reception impact assessments for the proposed �£1.3B Trinity Islands Project arising from Q4 2016 and Q1 2017 proposed design amendments, Manchester

St. James – Pre-construction television signal survey and reception impact assessment for the Southall Waterside Project. Impact assessments to Heathrow navigational and communications aids were also undertaken as requirements of the associated S106 Agreement, London, (Southall)

WYG & Severn Capital – TV, radio and telecommunications reception impact assessments for the proposed PRB Phase 2 development, Birmingham

 
Ove Arup and Partners International Limited – TV reception signal surveys and QOS assessments to support planning for London’s new tallest building – 22 Bishopsgate Development, London (City)
 
Montagu Evans – Telecommunications planning advice for the Bracknell Bus Depot Development, Bracknell (Bracknell Forest Borough Council)
 
St. James – Mobile phone interference investigations at Centre House, White City, London (LBHF)

Ove Arup and Partners International Limited – TV reception signal surveys and QOS assessments to support planning for London’s new tallest building – 22 Bishopsgate Development, London (City)

Berkeley Group – TV reception surveys for the completed Kidbrooke Phase 5 development, Kidbrooke Village, London (Greenwich)

 

Quarrymen Investment Holdings Limited – TV signal reception surveys and impact assessments for the proposed Park Lane and Heaps Mill redevelopment in Liverpool

Dandara Living Birmingham LP – TV, Radio and Telecommunications impact assessments for the Arena Central Development in Birmingham

Prosperous Global China Capital 1
– TV, radio and telecommunications impact assessments to support a planning application for the proposed 75-80 High Street Development in Bordesley, Birmingham

St. George – Post-construction TV and radio reception surveys to discharge a planning condition relating to the completed One Black Friars development, London (Southwark)

Redrow Homes Limited – TV and radio reception surveys to discharge planning conditions relating to the West Works development, London (Ealing)

Hotel La Tour – Milton Keynes – Baseline / pre-construction RF surveys (TV, DAB and FM radio broadcast services) for the proposed Hotel La Tour development in Milton Keynes. The work was undertaken to support the planning application

 

Hoare Lea – Baseline / pre-construction RF surveys (TV, DAB and FM radio broadcast services) for the proposed 20-36 High Street Manchester development

Heeton SG50 – Baseline / pre-construction RF surveys (TV, DAB and FM radio broadcast services) for the proposed 28-30 Oldham Street Manchester redevelopment

 

Carillion – TV, radio and telecommunication impact assessments for a EIA Telecommunications Chapter for the proposed Nine Elms Skill Centre development, London (Lambeth)

Berkeley Group – Fifth television and radio signal reception survey for the One Tower Bridge development, London (Southwark)

Ramboll Environ – Telecommunications EIA / ES input for the amended proposed Westfield Shopping Centre development, London (Hammersmith & Fulham)

Ramboll Environ – Telecommunications EIA / ES input for the proposed amended development at 283 Edgware Road, London (Westminster)

Ramboll & Berkeley Group – ES Telecommunications Chapter update and review following significant changes to the proposed West End Green development, London (Westminster)

Royal London Asset Management – TV and radio reception impact assessments for the John Dalton House development, Manchester

WPC Portsmouth – Pre-construction television signal survey and reception impact assessment for the Portsmouth One development, Portsmouth

Galliard Homes – DLR signal surveys, TV reception impact assessments and telecommunications interference investigations to support planning condition discharge for the Baltimore Wharf development, London, (Tower Hamlets)

Ramboll Environ – Telecommunications EIA / ES input for the proposed 14-17 Paddington Green development, London (Westminster)

Derwent London – 2G (GSM), 3G (UMTS) and 4G (LTE) mobile phone network signal surveys for the 9 Prescot Street redevelopment, London (Tower Hamlets)

Bamfords Trust PLC – GSM-R signals survey and reception impact assessments for the proposed Ford Square Mosque, London (Tower Hamlets)

 

Taylor Wimpey Central London – Pre-construction television and radio reception survey and reception impact assessments for the proposed Golden Lane development, London (City)

Greystar– Pre-construction 2G, 3G, 4G, broadcast radio and television and TETRA (Airwave) reception and signal surveys to support planning for the Greenford Green project. This project designed by HTA Design LLP will revitalise 8.64 hectares of derelict, former industrial land adjacent to the historic Grand Union Canal in South Ealing into a unique, attractive mixed-use neighbourhood. A total of 1,965 new homes are planned, of which approximately a substantial 75% will be Build-to-Rent. The scheme will introduce new local shops and workspaces, a supermarket, restaurants, cafes, public gym, boutique cinema, and a 2-form primary school, London (Ealing)

Edif Group – Pre-construction television signal surveys and reception impact assessments for the proposed Sampson and Ludgate House development, London (Southwark)

Barratt Homes – Pre and post-construction television reception surveys for the Catford Green development, London (Lewisham)

Mace – Pre-construction TV and radio baseline signal survey and impact assessments for the proposed Westferry Printworks development, London (Tower Hamlets)

St. James – Pre-construction television signal survey and reception impact assessment for the Southall Waterside Project. Impact assessments to Heathrow navigational and communications aids were also undertaken as requirements of the associated S106 Agreement, London, (Southall)

GVA Second London Wall and Taylor Wimpey Central London – Post-construction television reception survey and reception impact assessments for the completed North Wharf Gardens development, London (Westminster)

St. James – Post-construction television and radio reception surveys to discharge an associated S106 relating to the near completed Hornsey Depot development, London (Haringey)

Carillion – TV, radio and telecommunications impact assessments for a EIA Telecommunications Chapter for the proposed Nine Elms Skill Centre development, London (Lambeth)

St. James – Pre-construction television signal survey and reception impact assessment for the Riverlight Project, London, (Wandsworth)

TATE Modern – Post-construction TV signal survey and telecommunications reception impact assessments for completed TATE Modern development, London, (Southwark)

Wates – 2G (GSM), 3G (UMTS) and 4G (LTE) mobile phone network signal surveys for the proposed Greenwich Peninsula development, London (Greenwich)

2 Circles Communications – 2G, 3G, 4G mobile network signal surveys in and around the One Angel Court development to assess if a distributed antenna system (DAS) was required. We are an independent survey company, not aligned with any product or service provider and as such can provide unbiased assessments based on actual in-building coverage, whether it is poor or optimal, London (Bank)

Jackson’s Row – Pre-construction television signal survey and reception impact assessment for the Jackson’s Row, Manchester

BILT – Pre-construction television signal survey and reception impact assessment for the Element project, Manchester

Manchester Metropolitan University – Pre-construction television signal survey and reception impact assessment for the MMU Arts and Media building development, Manchester

Angel Meadows (FEC) Limited and 5plus Architects – TV and radio signal survey work and reception impact assessments to support the planning application for the Angel Meadows development, Manchester

Middlewood Locks and Fairbriar Developments – Multi phase TV signal reception work for the Middlewood Locks Scheme, Salford

Lendlease – Pre-construction TV and radio signal surveys and reception impact assessments to support planning matters for the Timberyard development, London (Lewisham)

Hoare Lea – Baseline / pre-construction RF surveys (TV, DAB and FM radio broadcast services) for the proposed Riverwalk House development, London (Westminster)

RINA Consulting Defence Limited / EDIF Group – Multiphase TV signal surveys and reporting for the Battersea Power Station development. This ongoing work is to discharge an associated S106 agreement. London (Wandsworth)

St. James – Post-construction TETRA (Airwave) signal survey to discharge LBHF’s Planning Condition 71 relating to the White City Living scheme. The work was required to ensure TETRA coverage at the nearby Shepherd’s Bush Police Station was not affected by the proposed development.
 

Macegroup and SkyRF Interference investigations for tower crane control systems at the new Sky TV HQ development, Isleworth

RINA Consulting Defence Limited / EDIF Group – Post-construction TV signal survey and reporting for the completed London Wall Place development. The work was required to discharge an associated S106. London (City)

Manchester City Council – Pre-construction television signal survey and reception impact assessment for the Factory development, Manchester

Hoare Lea – Baseline / pre-construction RF surveys (TV, DAB and FM radio broadcast services) for the proposed Rathbone Market development, London (Newham)

Hoare Lea – Baseline / pre-construction RF surveys (TV, DAB and FM radio broadcast services) for the proposed Shell Centre redevelopment, London (Lambeth)

Unite Group – Pre-construction television signal survey and reception impact assessment for the Chaucer House development, Portsmouth

Titan Property Developments Limited – Pre-construction telecommunications, television and radio impact assessments for the Station Hill redevelopment project, Reading

Ilford (Jersey) Limited – Pre-construction television signal survey and reception impact assessment for the proposed Harrison Gibson development, Ilford

Ramboll Environ – Telecommunications EIA / ES input for the proposed 283 Edgware Road development, London (Westminster)

Vigilant Global – TV reception assessments for the proposed 320m tall Richborough Mast

Bowmer and Kirkland NW – Pre-construction television signal survey and reception impact assessment for a development in Salford

HOW Planning LLP – Pre-construction television signal survey and reception impact assessment for a development in Lord Street, Manchester

2 Merchant Square Limited Partnership – TV signal surveys and reception impact assessments for the 2 Merchant Square development, Paddington Basin, London (Westminster)

Berkeley Group – Post-construction television and radio signal reception survey for the One Tower Bridge development, London (Southwark)

Allied LondonSt John’s development. TV and radio signal surveys and reception impact assessments, Manchester

Hilson Moran Partnership LimitedFormer Boddingtons Site, Manchester. Pre-construction TV reception survey and reception impact assessment. Any development over 4 storeys in Manchester requires a TV reception impact assessment as part of MCC guidance.

Hilson Moran Partnership LimitedSprucefield Retail Park, Northern Ireland. Desktop-based impact assessments to support pre-application documents and EIA for matters relating to local TV, radio and telecommunications operations.

IFA2 – Interconnexion France-Angleterre – A High Voltage Direct Current (HVDC) cable for power connection between Great Britain and France. We undertook television, radio, 2G, 3G, 4G and TETRA baseline signal surveys prior to construction work in order to record the baseline reception conditions around the scheme

St James – Pre-construction television signal survey and reception impact assessment for the White City development, London (Hammersmith and Fulham)

Bamfords Trust PLC – GSM-R signals survey and reception impact assessments for the proposed Ford Square Mosque, London (Tower Hamlets)

Wates – 2G (GSM), 3G (UMTS) and 4G (LTE) mobile phone network signal surveys for the proposed Greenwich Peninsula development, London (Greenwich)

Ramboll Environ – TETRA signal surveys to discharge associated planning conditions for the ongoing Westfield Shopping Complex, White City, London (Hammersmith and Fulham)

Thames Water 3G / UMTS Elevated mobile network signal reception assessments at a number of borehole sites in Kent. The work was needed to determine if 3G would provide back up to ISDN / ADSL, if those circuits failed.

ARCO – Pre-construction television signal survey and reception impact assessment for the NDC development, Hull

at800 – We have undertaken nationwide RF and technical surveys of LTE (4G) and DVB-T (Freeview) networks to assist interference modelling to better interference free co-existence between the UK’s new 4G mobile phone networks and the UK’s digital terrestrial television platform, Freeview. Some good information is available here from at800 about what is occurring and why

Berkeley Group – Fourth television and radio signal reception survey for the One Tower Bridge development, London (Southwark)

Sterling Property Ventures – Pre-construction TV, radio and telecommunications surveys and impact assessments to discharge a S106 planning condition relating to the proposed 103 Colmore Row development (a �£60 million 26-storey office block with 200,000 sq ft of office space), Birmingham

Ofcom and Aegis Systems Ltd – We have provided television transmitter coverage surveys (location variability) to assist in the ongoing UK television planning model verification project. Read more here about the project we are working on (understanding location variability) and why it is important for TV white space future