Lambeth – Electromagnetic Interference – Pre-Occupation Television, Radio and Mobile Phone Reception Assessments

We provide electromagnetic interference assessments to assist developers discharge planning conditions with respect to pre-occupation requirements. The majority of this work is conducted in London (Lambeth in particular) and a typical planning condition may state;
Electromagnetic Interference

Prior to occupation of development, a report prepared by an appropriately qualified consultant shall be submitted for approval in writing investigating the possible impact to television, radio, and mobile phone broadcasting and reception as well as proposing any mitigation measures. Any mitigation measures shall be implemented prior to occupation and maintained thereafter for the lifetime of the development.
The technical report compiled from the initial desktop study and results of signal survey work will detail; the requirements to discharge the planning condition, the findings of the site survey, a technical interference discussion, any required mitigation measures, and can subsequently be used to discharge the planning application or be used for reference.

London Borough of Lambeth
Contact us on 01926 744771 to discuss your requirements