Current Projects and Clients – April 2024

Planning Support (ES / EIA, S73, S106 and LPA requirements), Pre / Post-Construction TV, Radio, TETRA (Airwave) and Mobile Phone Signal Surveys to support Planning Application Submissions and Developer Due Diligence

Contact us on 01926 744771 to discuss your requirements
Old Kent Road Schemes – London Borough of Southwark
Avanton and GL Hearn Limited – ES and EIA Telecommunications chapter production for the Ruby Triangle Scheme on the Old Kent Road, London (Southwark)

Berkeley Group – TV, radio and telecommunications impact assessments for the Malt Street Redevelopment, Old Kent Road, London (Southwark)

Savills and Ramboll – TV, radio and telecommunications impact assessments for the Cantium Retail Park redevelopment, Old Kent Road, London (Southwark)

Tailored Living Solutions Ltd – Post-construction TV, radio and telecommunications impact to discharge a related planning condition for the 67 Southwark Street development, London (Southwark)
DP9 and CBRE – TV, radio and telecommunications impact assessments for the development at 596-608 Old Kent Road and Land at Livesey Place, Old Kent Road, London (Southwark)
Old Kent Road Masterplan - Telecommunications Assessments

Other London Schemes


Mount Anvil – Tv and radio reception surveys and reporting for The Silk District, Whitechapel E1 development, London (Tower Hamlets)
Westfields Construction – TV reception surveys to support the planning application for 56 Shepherd’s Bush, London (LBHF)
Kitewood Development Projects Limited – TV and radio reception surveys to support the Creekside Village East EIA submission, London (Greenwich and Lewisham)
St. Modwen – Television, radio and telecommunications reception impact assessments and reports to support the Leegate Shopping Centre redevelopment in Lee Green, London (Lewisham)
Higgins Group – Post-construction TV and radio surveys for the completed 2-12 High Street Stratford development, London (Newham)
Croydon Schemes
Crystal Palace Football Club (CPFC) – TV, radio and telecommunications impact assessments to support the
proposed Selhurst Park Stadium redevelopment
Brick by Brick Croydon Limited – TV, radio and telecommunications impact assessments to support a planning application for the proposed Addiscombe Grove development. We are now the Croydon Council Approved supplier for all matters relating to construction / planning and TV, radio and telecommunicationsread more here
Brick by Brick Croydon Limited – TV and radio surveys and impact assessments for the proposed Lion Green Road scheme in Croydon
Manchester Schemes
Alumno Student Developments Limited – Pre-construction TV signal survey and reports to support the Church Inn application, Manchester
Ask Real Estate and Deloitte – Pre-construction TV signal survey and report to support the First Street Plot 9a application, Manchester
Student Castle and GMS (Parking) Limited – Pre-construction TV signal survey and report to support the Great Marlborough Street application, Manchester
Cable Swan Limited (Consisting of Sir Robert McAlpine, Britannia Group, Prime Developers, and Foundation Real Estate) – TV reception surveys and reports for the SimpsonHaugh-designed development on the site of Swan House, which sits on the corner of Swan Street and Rochdale Road, Manchester
Qbic Hotels – Pre-construction TV signal survey and report to support the John Dalton House planning application, Manchester
60 Oldham Street Limited – Pre-construction television signal survey and report to support the Oldham Street application, Manchester

TitleDeed Limited – Pre-construction TV signal survey and report to support a Spear Street development application, Manchester
Other UK Projects
Torsion Group – Television and radio reception survey and report to support the planning application for the Former Nautical Club redevelopment, Birmingham
Creatability Limited – TV and radio reception survey and reports to support the planning
application for the Newquay Trampoline Park, Newquay
Creatability Limited – Television and radio reception survey and reports to support the planning
application for the King George Playing Fields development in Brentford

Wind Energy Planning Support (ES/EIA, S106 and LPA requirements) – Pre and Post-Construction TV, Radio, Telecommunication (microwave and fixed radio links) and Mobile Phone Signal Surveys and Reception Impact Assessments
Natural Power and Brenig Wind Farm – Telecommunications impact assessments for the Brenig Wind Farm development, Wales
Energia – Pre-construction TV signal surveys and reception impact assessments for the Long Mount, Glenbuck and Eshmore Wind Farms, County Antrim, Northern Ireland
Energia – Pre-construction TV signal surveys and reception impact assessments for the Altamuskin and Gortinbar Wind Farms, County Tyrone, Northern Ireland

Energia – Pre-construction TV signal survey and reception impact assessment for the Rathsherry Wind Farm, Northern Ireland

SSE Renewables – 2G and 3G mobile phone signal surveys and FWALA survey work and reception impact assessments for the proposed Leanamore Wind Farm, Ireland. Leanamore Wind Farm in County Kerry has a permitted export capacity of 18MW, enough to power over 10,000 homes with renewable energy, while offsetting around 16,500 tonnes of harmful CO2 emissions every year

SSE Renewables – TV reception survey work and interference assessments for the Galway Wind Park, Ireland. The 174MW Galway Wind Park, co-developed by SSE and Coillte in Connemara’s Cloosh Valley, is Ireland’s largest and best performing wind farm, generating more green energy than any other wind generation site on the island

Galway Wind Park TV Signal Survey


Radio Frequency (RF), TV and Radio Interference Investigations

RES Group – TV interference investigations in Stanhope relating to the operational Jack’s Lane Wind Farm


2G (GSM / GPRS), 3G (UMTS) and 4G (LTE) Mobile Phone Signal Surveys
The Royal Parks – 2G, 3G and 4G surveys to assess communications access in Richmond and
Bushy Parks. This work was required to determine if wireless car park
payment meters would operate correctly
FARR Engineering – 2G, 3G and 4G mobile phone signal survey and coverage assessments in the new Croxley Business Park Building 1 development, Watford
NHS Trust East Lancashire Hospitals 4G mobile phone signal surveys in critical areas of the Royal Blackburn Hospital to determine if 4G services could provide an alternative backup over NHS IT systems should their systems fail.

NHS Royal Blackburn Hospital Mobile Phone Signal Survey
Total E&P3G (UMTS) and 4G (LTE) mobile phone signal surveys for the completed Shetland Gas Plant,
Shetland Isles, Scotland. The work was undertaken to
determine if 3G and 4G services were available in plant critical
locations. Particular attention was paid to reception conditions around
the MEG processing plant where Total plans to operate a robot for
essential repairs. The mono-ethylene glycol (MEG) regeneration and
recycling unit was built to reuse the MEG that is injected into the
Laggan-Tormore flowlines to prevent possible blockage due to cold
climatic conditions.


Total's_Shetland_Gas_Plant_4G_Signal_Survey.jpg

Bowmer & Kirkland2G, 3G and 4G mobile phone signal surveys for the completed Tara House development in Liverpool. The work was undertaken to determine if a distributed antenna system (DAS) was required to ensure good coverage throughout the structure.


Tara House Liverpool Mobile Phone Signal Survey

Berkeley Group – 2G, 3G and 4G mobile phone network surveys for the completed Kidbrooke Block D development, Kidbrooke Village, London (Greenwich)

Kidbrooke Village Mobile Phone Signal Survey

    


Radio Signal Monitoring, RF Survey Support, RF Signal Measurement Campaigns and RF Drive Testing

Hoare Lea – Baseline / pre-construction RF surveys (TV, DAB and FM radio
broadcast services) for the proposed Cairo Place development, London (Croydon)

Cairo Place


Hoare Lea – Baseline / pre-construction RF surveys (TV, DAB and FM radio
broadcast services) for the proposed Northern Retail Quarter, Reading

Hoare Lea – Baseline / pre-construction RF surveys (TV, DAB and FM radio
broadcast services) for the proposed Riverwalk House development, London (Westminster)


Recently Completed Projects


Deliotte, Manchester Quays Limited and Allied London – TV, radio and mobile phone network reception impact assessments for the proposed £1.3B Trinity Islands Project arising from Q4 2016 and Q1 2017 proposed design amendments, Manchester

Trinity Islands Manchester

St. James – Pre-construction television signal survey and reception impact assessment for the Southall Waterside Project.
Impact assessments to Heathrow navigational and communications aids
were also undertaken as requirements of the associated S106 Agreement,
London, (Southall)

WYG & Severn Capital – TV, radio and telecommunications reception impact assessments for the proposed PRB Phase 2 development, Birmingham

Ove Arup and Partners International Limited – TV reception signal surveys and QOS assessments to support planning for London’s new tallest building – 22 Bishopsgate Development, London (City)

Montagu Evans – Telecommunications planning advice for the Bracknell Bus Depot Development, Bracknell (Bracknell Forest Borough Council)
St. James – Mobile phone interference investigations at Centre House, White City, London (LBHF)

TV Reception Survey

Ove Arup and Partners International Limited – TV reception signal surveys and QOS assessments to support planning for London’s new tallest building – 22 Bishopsgate Development, London (City)

Berkeley Group – TV reception surveys for the completed Kidbrooke Phase 5 development, Kidbrooke Village, London (Greenwich)

Kidbrooke Village Mobile Phone Signal Survey

Quarrymen Investment Holdings Limited – TV signal reception surveys and impact assessments for the proposed Park Lane and Heaps Mill redevelopment in Liverpool

Dandara Living Birmingham LP – TV, Radio and Telecommunications impact assessments for the Arena Central Development in Birmingham

Prosperous Global China Capital 1
– TV, radio and telecommunications impact assessments to support a planning application for the proposed 75-80 High Street Development in Bordesley, Birmingham

St. George – Post-construction TV and radio reception surveys to discharge a planning condition relating to the completed One Black Friars development, London (Southwark)

Redrow Homes Limited – TV and radio reception surveys to discharge planning conditions relating to the West Works development, London (Ealing)

Hotel La Tour – Milton Keynes – Baseline / pre-construction RF surveys (TV, DAB and FM radio
broadcast services) for the proposed Hotel La Tour development in Milton Keynes. The work was undertaken to support the planning application

Hoare Lea – Baseline / pre-construction RF surveys (TV, DAB and FM radio
broadcast services) for the proposed 20-36 High Street Manchester development

Heeton SG50 – Baseline / pre-construction RF surveys (TV, DAB and FM radio
broadcast services) for the proposed 28-30 Oldham Street Manchester redevelopment

Carillion – TV, radio and telecommunication impact assessments for a EIA Telecommunications Chapter for the proposed Nine Elms Skill Centre development, London (Lambeth)

Berkeley Group – Fifth television and radio signal reception survey for the One Tower Bridge development, London (Southwark)

One Tower Bridge

Ramboll Environ – Telecommunications EIA / ES input for the amended proposed Westfield Shopping Centre development, London (Hammersmith & Fulham)

Westfield and BBC TV Centre

Ramboll Environ – Telecommunications EIA / ES input for the proposed amended development at 283 Edgware Road, London (Westminster)

Ramboll & Berkeley Group – ES Telecommunications Chapter update and review following significant changes to the proposed West End Green development, London (Westminster)

West End Green

Royal London Asset Management – TV and radio reception impact assessments for the John Dalton House development, Manchester

WPC Portsmouth – Pre-construction television signal survey and reception impact assessment for the Portsmouth One development, Portsmouth

Portsmouth One

Galliard Homes – DLR signal surveys, TV reception impact assessments and
telecommunications interference investigations to support planning
condition discharge for the Baltimore Wharf development, London, (Tower Hamlets)

Baltimore Wharf

Ramboll Environ – Telecommunications EIA / ES input for the proposed 14-17 Paddington Green development, London (Westminster)

Derwent London – 2G (GSM), 3G (UMTS) and 4G (LTE) mobile phone network signal surveys for the 9 Prescot Street redevelopment, London (Tower Hamlets)

Bamfords Trust PLC – GSM-R signals survey and reception impact assessments for the proposed Ford Square Mosque, London (Tower Hamlets)

Taylor Wimpey Central London – Pre-construction television and radio reception survey and reception
impact assessments for the proposed Golden Lane development, London (City)

Greystar
Pre-construction 2G, 3G, 4G, broadcast radio and television and TETRA
(Airwave) reception and signal surveys to support planning for the Greenford Green project.
This project designed by HTA Design LLP will revitalise 8.64 hectares
of derelict, former industrial land adjacent to the historic Grand Union
Canal in South Ealing into a unique, attractive mixed-use
neighbourhood. A total of 1,965 new homes are planned, of which
approximately a substantial 75% will be Build-to-Rent. The scheme will
introduce new local shops and workspaces, a supermarket, restaurants,
cafes, public gym, boutique cinema, and a 2-form primary school, London (Ealing)

Greenford Green

Edif Group – Pre-construction television signal surveys and reception impact assessments for the proposed Sampson and Ludgate House development, London (Southwark)

Sampson and Ludgate House

Barratt Homes – Pre and post-construction television reception surveys for the Catford Green development, London (Lewisham)

Catford Green

Mace – Pre-construction TV and radio baseline signal survey and impact
assessments for the proposed Westferry Printworks development, London (Tower Hamlets)

Mace Westferry

St. James – Pre-construction television signal survey and reception impact assessment for the Southall Waterside Project.
Impact assessments to Heathrow navigational and communications aids
were also undertaken as requirements of the associated S106 Agreement,
London, (Southall)

GVA Second London Wall and Taylor Wimpey Central London – Post-construction television reception survey and reception
impact assessments for the completed North Wharf Gardens development, London (Westminster)

North Wharf Gardens

St. James – Post-construction television and radio reception surveys to discharge
an associated S106 relating to the near completed Hornsey Depot
development, London (Haringey)

Hornsey Depot

Carillion – TV, radio and telecommunications impact assessments for a EIA Telecommunications Chapter for the proposed Nine Elms Skill Centre development, London (Lambeth)

St. James – Pre-construction television signal survey and reception impact assessment for the Riverlight Project, London, (Wandsworth)

River Light

TATE Modern – Post-construction TV signal survey and telecommunications reception impact assessments for completed TATE Modern development, London, (Southwark)

Tate Modern Southwark

Wates – 2G (GSM), 3G (UMTS) and 4G (LTE) mobile phone network signal surveys
for the proposed Greenwich Peninsula development, London (Greenwich)

2 Circles Communications – 2G, 3G, 4G mobile network signal surveys in and around the One Angel Court development to assess if a distributed antenna system (DAS) was
required. We are an independent survey company, not aligned with any
product or service provider and as such can provide unbiased assessments
based on actual in-building coverage, whether it is poor or optimal,
London (Bank)

One Angel Court

    
Jackson’s Row – Pre-construction television signal survey and reception impact assessment for the Jackson’s Row, Manchester

BILT – Pre-construction television signal survey and reception impact assessment for the Element project, Manchester

Manchester Metropolitan University – Pre-construction television signal survey and reception impact assessment for the MMU Arts and Media building development, Manchester

Angel Meadows (FEC) Limited and 5plus Architects – TV and radio signal survey work and reception impact assessments to
support the planning application for the Angel Meadows development, Manchester

Angel Meadows - Manchester TV Signal Survey

Middlewood Locks and Fairbriar Developments – Multi phase TV signal reception work for the Middlewood Locks Scheme, Salford

Middlewood Locks

Lendlease – Pre-construction TV and radio signal surveys and reception impact
assessments to support planning matters for the Timberyard development,
London (Lewisham)

Deptford Timberyard

Hoare Lea – Baseline / pre-construction RF surveys (TV, DAB and FM radio
broadcast services) for the proposed Riverwalk House development, London (Westminster)

RINA Consulting Defence Limited / EDIF Group – Multiphase TV signal surveys and reporting for the Battersea Power Station development. This ongoing work is to discharge an associated S106 agreement. London (Wandsworth)

Battersea Power Station
St. James – Post-construction TETRA (Airwave) signal survey to discharge LBHF’s
Planning Condition 71 relating to the White City Living scheme. The work
was required to ensure TETRA coverage at the nearby Shepherd’s Bush
Police Station was not affected by the proposed development.

White City Living

Macegroup and SkyRF Interference investigations for tower crane control systems at the new Sky TV HQ development, Isleworth

RINA Consulting Defence Limited / EDIF Group – Post-construction TV signal survey and reporting for the completed
London Wall Place development. The work was required to discharge an
associated S106. London (City)

London_Wall_Place

Manchester City Council – Pre-construction television signal survey and reception impact assessment for the Factory development, Manchester

Factory

Hoare Lea – Baseline / pre-construction RF surveys (TV, DAB and FM radio
broadcast services) for the proposed Rathbone Market development, London (Newham)

Hoare Lea – Baseline / pre-construction RF surveys (TV, DAB and FM radio
broadcast services) for the proposed Shell Centre redevelopment, London (Lambeth)

Unite Group – Pre-construction television signal survey and reception impact assessment for the Chaucer House development, Portsmouth

Titan Property Developments Limited – Pre-construction telecommunications, television and radio impact
assessments for the Station Hill redevelopment project, Reading

Station Hill Reading

Ilford (Jersey) Limited – Pre-construction television signal survey and reception impact assessment for the proposed Harrison Gibson development, Ilford

Ramboll Environ – Telecommunications EIA / ES input for the proposed 283 Edgware Road development, London (Westminster)

Vigilant Global – TV reception assessments for the proposed 320m tall Richborough Mast

Bowmer and Kirkland NW – Pre-construction television signal survey and reception impact assessment for a development in Salford
 
HOW Planning LLP – Pre-construction television signal survey and reception impact assessment for a development in Lord Street, Manchester

2 Merchant Square Limited Partnership – TV signal surveys and reception impact assessments for the 2 Merchant Square development, Paddington Basin, London (Westminster)

Berkeley Group – Post-construction television and radio signal reception survey for the One Tower Bridge development, London (Southwark)

One Tower Bridge - S106 TV Survey Reception Work

Allied LondonSt John’s development. TV and radio signal surveys and reception impact assessments, Manchester

St John's Manchester

Hilson Moran Partnership LimitedFormer Boddingtons Site, Manchester.
Pre-construction TV reception survey and reception impact assessment.
Any development over 4 storeys in Manchester requires a TV reception
impact assessment as part of MCC guidance.

Hilson Moran Partnership LimitedSprucefield Retail Park, Northern Ireland.
Desktop-based impact assessments to support pre-application documents
and EIA for matters relating to local TV, radio and telecommunications
operations.

Sprucefield Retail Park

IFA2 – Interconnexion France-Angleterre – A High Voltage Direct Current
(HVDC) cable for power connection between Great Britain and France. We
undertook television, radio, 2G, 3G, 4G and TETRA baseline signal
surveys prior to construction work in order to record the baseline
reception conditions around the scheme

IFA2 TETRA Signal Survey

St James – Pre-construction television signal survey and reception impact assessment for the White City development, London (Hammersmith and Fulham)

Bamfords Trust PLC – GSM-R signals survey and reception impact assessments for the proposed Ford Square Mosque, London (Tower Hamlets)

Wates – 2G (GSM), 3G (UMTS) and 4G (LTE) mobile phone network signal surveys
for the proposed Greenwich Peninsula development, London (Greenwich)

Ramboll Environ – TETRA signal surveys to discharge associated planning conditions for
the ongoing Westfield Shopping Complex, White City, London (Hammersmith and Fulham)

Thames Water 3G
/ UMTS Elevated mobile network signal reception assessments at a number
of borehole sites in Kent. The work was needed to determine if 3G would
provide back up to ISDN / ADSL, if those circuits failed.

3G Survey with Thames Water

    
ARCO – Pre-construction television signal survey and reception impact assessment for the NDC development, Hull

at800 – We have undertaken nationwide RF and technical surveys of LTE (4G) and DVB-T (Freeview) networks to assist interference modelling to
better interference free co-existence between the UK’s new 4G mobile
phone networks and the UK’s digital terrestrial television platform,
Freeview. Some good information is available here from at800 about what is occurring and why

Berkeley Group – Fourth television and radio signal reception survey for the One Tower Bridge development, London (Southwark)

Sterling Property Ventures – Pre-construction TV, radio and telecommunications surveys and impact
assessments to discharge a S106 planning condition relating to the
proposed 103 Colmore Row development (a £60 million 26-storey office
block with 200,000 sq ft of office space), Birmingham

Ofcom and Aegis Systems Ltd – We have provided television transmitter coverage surveys (location variability) to assist in the ongoing UK television planning model verification project. Read more here about the project we are working on (understanding location variability) and why it is important for TV white space future