Other London Schemes
proposed Selhurst Park Stadium redevelopment
application for the Newquay Trampoline Park, Newquay
application for the King George Playing Fields development in Brentford
SSE Renewables – 2G and 3G mobile phone signal surveys and FWALA survey work and reception impact assessments for the proposed Leanamore Wind Farm, Ireland. Leanamore Wind Farm in County Kerry has a permitted export capacity of 18MW, enough to power over 10,000 homes with renewable energy, while offsetting around 16,500 tonnes of harmful CO2 emissions every year
SSE Renewables – TV reception survey work and interference assessments for the Galway Wind Park, Ireland. The 174MW Galway Wind Park, co-developed by SSE and Coillte in Connemara’s Cloosh Valley, is Ireland’s largest and best performing wind farm, generating more green energy than any other wind generation site on the island
RES Group – TV interference investigations in Stanhope relating to the operational Jack’s Lane Wind Farm
Bushy Parks. This work was required to determine if wireless car park
payment meters would operate correctly
Shetland Isles, Scotland. The work was undertaken to
determine if 3G and 4G services were available in plant critical
locations. Particular attention was paid to reception conditions around
the MEG processing plant where Total plans to operate a robot for
essential repairs. The mono-ethylene glycol (MEG) regeneration and
recycling unit was built to reuse the MEG that is injected into the
Laggan-Tormore flowlines to prevent possible blockage due to cold
climatic conditions.
Bowmer & Kirkland – 2G, 3G and 4G mobile phone signal surveys for the completed Tara House development in Liverpool. The work was undertaken to determine if a distributed antenna system (DAS) was required to ensure good coverage throughout the structure.
Hoare Lea – Baseline / pre-construction RF surveys (TV, DAB and FM radio
broadcast services) for the proposed Cairo Place development, London (Croydon)
Hoare Lea – Baseline / pre-construction RF surveys (TV, DAB and FM radio
broadcast services) for the proposed Northern Retail Quarter, Reading
Hoare Lea – Baseline / pre-construction RF surveys (TV, DAB and FM radio
broadcast services) for the proposed Riverwalk House development, London (Westminster)
Deliotte, Manchester Quays Limited and Allied London – TV, radio and mobile phone network reception impact assessments for the proposed £1.3B Trinity Islands Project arising from Q4 2016 and Q1 2017 proposed design amendments, Manchester
Impact assessments to Heathrow navigational and communications aids
were also undertaken as requirements of the associated S106 Agreement,
London, (Southall)
WYG & Severn Capital – TV, radio and telecommunications reception impact assessments for the proposed PRB Phase 2 development, Birmingham
Ove Arup and Partners International Limited – TV reception signal surveys and QOS assessments to support planning for London’s new tallest building – 22 Bishopsgate Development, London (City)
Berkeley Group – TV reception surveys for the completed Kidbrooke Phase 5 development, Kidbrooke Village, London (Greenwich)
Quarrymen Investment Holdings Limited – TV signal reception surveys and impact assessments for the proposed Park Lane and Heaps Mill redevelopment in Liverpool
Dandara Living Birmingham LP – TV, Radio and Telecommunications impact assessments for the Arena Central Development in Birmingham
Prosperous Global China Capital 1 – TV, radio and telecommunications impact assessments to support a planning application for the proposed 75-80 High Street Development in Bordesley, Birmingham
Redrow Homes Limited – TV and radio reception surveys to discharge planning conditions relating to the West Works development, London (Ealing)
Hotel La Tour – Milton Keynes – Baseline / pre-construction RF surveys (TV, DAB and FM radio
broadcast services) for the proposed Hotel La Tour development in Milton Keynes. The work was undertaken to support the planning application
broadcast services) for the proposed 20-36 High Street Manchester development
Heeton SG50 – Baseline / pre-construction RF surveys (TV, DAB and FM radio
broadcast services) for the proposed 28-30 Oldham Street Manchester redevelopment
Berkeley Group – Fifth television and radio signal reception survey for the One Tower Bridge development, London (Southwark)
Ramboll Environ – Telecommunications EIA / ES input for the amended proposed Westfield Shopping Centre development, London (Hammersmith & Fulham)
Ramboll Environ – Telecommunications EIA / ES input for the proposed amended development at 283 Edgware Road, London (Westminster)
Ramboll & Berkeley Group – ES Telecommunications Chapter update and review following significant changes to the proposed West End Green development, London (Westminster)
Royal London Asset Management – TV and radio reception impact assessments for the John Dalton House development, Manchester
WPC Portsmouth – Pre-construction television signal survey and reception impact assessment for the Portsmouth One development, Portsmouth
Galliard Homes – DLR signal surveys, TV reception impact assessments and
telecommunications interference investigations to support planning
condition discharge for the Baltimore Wharf development, London, (Tower Hamlets)
Ramboll Environ – Telecommunications EIA / ES input for the proposed 14-17 Paddington Green development, London (Westminster)
Derwent London – 2G (GSM), 3G (UMTS) and 4G (LTE) mobile phone network signal surveys for the 9 Prescot Street redevelopment, London (Tower Hamlets)
Bamfords Trust PLC – GSM-R signals survey and reception impact assessments for the proposed Ford Square Mosque, London (Tower Hamlets)
impact assessments for the proposed Golden Lane development, London (City)
Greystar–
Pre-construction 2G, 3G, 4G, broadcast radio and television and TETRA
(Airwave) reception and signal surveys to support planning for the Greenford Green project.
This project designed by HTA Design LLP will revitalise 8.64 hectares
of derelict, former industrial land adjacent to the historic Grand Union
Canal in South Ealing into a unique, attractive mixed-use
neighbourhood. A total of 1,965 new homes are planned, of which
approximately a substantial 75% will be Build-to-Rent. The scheme will
introduce new local shops and workspaces, a supermarket, restaurants,
cafes, public gym, boutique cinema, and a 2-form primary school, London (Ealing)
Edif Group – Pre-construction television signal surveys and reception impact assessments for the proposed Sampson and Ludgate House development, London (Southwark)
Barratt Homes – Pre and post-construction television reception surveys for the Catford Green development, London (Lewisham)
Mace – Pre-construction TV and radio baseline signal survey and impact
assessments for the proposed Westferry Printworks development, London (Tower Hamlets)
St. James – Pre-construction television signal survey and reception impact assessment for the Southall Waterside Project.
Impact assessments to Heathrow navigational and communications aids
were also undertaken as requirements of the associated S106 Agreement,
London, (Southall)
GVA Second London Wall and Taylor Wimpey Central London – Post-construction television reception survey and reception
impact assessments for the completed North Wharf Gardens development, London (Westminster)
St. James – Post-construction television and radio reception surveys to discharge
an associated S106 relating to the near completed Hornsey Depot
development, London (Haringey)
Carillion – TV, radio and telecommunications impact assessments for a EIA Telecommunications Chapter for the proposed Nine Elms Skill Centre development, London (Lambeth)
St. James – Pre-construction television signal survey and reception impact assessment for the Riverlight Project, London, (Wandsworth)
TATE Modern – Post-construction TV signal survey and telecommunications reception impact assessments for completed TATE Modern development, London, (Southwark)
for the proposed Greenwich Peninsula development, London (Greenwich)
2 Circles Communications – 2G, 3G, 4G mobile network signal surveys in and around the One Angel Court development to assess if a distributed antenna system (DAS) was
required. We are an independent survey company, not aligned with any
product or service provider and as such can provide unbiased assessments
based on actual in-building coverage, whether it is poor or optimal,
London (Bank)
Jackson’s Row – Pre-construction television signal survey and reception impact assessment for the Jackson’s Row, Manchester
BILT – Pre-construction television signal survey and reception impact assessment for the Element project, Manchester
Manchester Metropolitan University – Pre-construction television signal survey and reception impact assessment for the MMU Arts and Media building development, Manchester
Angel Meadows (FEC) Limited and 5plus Architects – TV and radio signal survey work and reception impact assessments to
support the planning application for the Angel Meadows development, Manchester
Middlewood Locks and Fairbriar Developments – Multi phase TV signal reception work for the Middlewood Locks Scheme, Salford
Lendlease – Pre-construction TV and radio signal surveys and reception impact
assessments to support planning matters for the Timberyard development,
London (Lewisham)
Hoare Lea – Baseline / pre-construction RF surveys (TV, DAB and FM radio
broadcast services) for the proposed Riverwalk House development, London (Westminster)
RINA Consulting Defence Limited / EDIF Group – Multiphase TV signal surveys and reporting for the Battersea Power Station development. This ongoing work is to discharge an associated S106 agreement. London (Wandsworth)
Planning Condition 71 relating to the White City Living scheme. The work
was required to ensure TETRA coverage at the nearby Shepherd’s Bush
Police Station was not affected by the proposed development.
Macegroup and Sky – RF Interference investigations for tower crane control systems at the new Sky TV HQ development, Isleworth
RINA Consulting Defence Limited / EDIF Group – Post-construction TV signal survey and reporting for the completed
London Wall Place development. The work was required to discharge an
associated S106. London (City)
Manchester City Council – Pre-construction television signal survey and reception impact assessment for the Factory development, Manchester
Hoare Lea – Baseline / pre-construction RF surveys (TV, DAB and FM radio
broadcast services) for the proposed Rathbone Market development, London (Newham)
Hoare Lea – Baseline / pre-construction RF surveys (TV, DAB and FM radio
broadcast services) for the proposed Shell Centre redevelopment, London (Lambeth)
Unite Group – Pre-construction television signal survey and reception impact assessment for the Chaucer House development, Portsmouth
Titan Property Developments Limited – Pre-construction telecommunications, television and radio impact
assessments for the Station Hill redevelopment project, Reading
Ilford (Jersey) Limited – Pre-construction television signal survey and reception impact assessment for the proposed Harrison Gibson development, Ilford
Ramboll Environ – Telecommunications EIA / ES input for the proposed 283 Edgware Road development, London (Westminster)
Vigilant Global – TV reception assessments for the proposed 320m tall Richborough Mast
Bowmer and Kirkland NW – Pre-construction television signal survey and reception impact assessment for a development in Salford
HOW Planning LLP – Pre-construction television signal survey and reception impact assessment for a development in Lord Street, Manchester
2 Merchant Square Limited Partnership – TV signal surveys and reception impact assessments for the 2 Merchant Square development, Paddington Basin, London (Westminster)
Berkeley Group – Post-construction television and radio signal reception survey for the One Tower Bridge development, London (Southwark)
Allied London – St John’s development. TV and radio signal surveys and reception impact assessments, Manchester
Hilson Moran Partnership Limited – Former Boddingtons Site, Manchester.
Pre-construction TV reception survey and reception impact assessment.
Any development over 4 storeys in Manchester requires a TV reception
impact assessment as part of MCC guidance.
Hilson Moran Partnership Limited – Sprucefield Retail Park, Northern Ireland.
Desktop-based impact assessments to support pre-application documents
and EIA for matters relating to local TV, radio and telecommunications
operations.
IFA2 – Interconnexion France-Angleterre – A High Voltage Direct Current
(HVDC) cable for power connection between Great Britain and France. We
undertook television, radio, 2G, 3G, 4G and TETRA baseline signal
surveys prior to construction work in order to record the baseline
reception conditions around the scheme
St James – Pre-construction television signal survey and reception impact assessment for the White City development, London (Hammersmith and Fulham)
Bamfords Trust PLC – GSM-R signals survey and reception impact assessments for the proposed Ford Square Mosque, London (Tower Hamlets)
Wates – 2G (GSM), 3G (UMTS) and 4G (LTE) mobile phone network signal surveys
for the proposed Greenwich Peninsula development, London (Greenwich)
Ramboll Environ – TETRA signal surveys to discharge associated planning conditions for
the ongoing Westfield Shopping Complex, White City, London (Hammersmith and Fulham)
Thames Water – 3G
/ UMTS Elevated mobile network signal reception assessments at a number
of borehole sites in Kent. The work was needed to determine if 3G would
provide back up to ISDN / ADSL, if those circuits failed.
ARCO – Pre-construction television signal survey and reception impact assessment for the NDC development, Hull
at800 – We have undertaken nationwide RF and technical surveys of LTE (4G) and DVB-T (Freeview) networks to assist interference modelling to
better interference free co-existence between the UK’s new 4G mobile
phone networks and the UK’s digital terrestrial television platform,
Freeview. Some good information is available here from at800 about what is occurring and why
Berkeley Group – Fourth television and radio signal reception survey for the One Tower Bridge development, London (Southwark)
Sterling Property Ventures – Pre-construction TV, radio and telecommunications surveys and impact
assessments to discharge a S106 planning condition relating to the
proposed 103 Colmore Row development (a £60 million 26-storey office
block with 200,000 sq ft of office space), Birmingham
Ofcom and Aegis Systems Ltd – We have provided television transmitter coverage surveys (location variability) to assist in the ongoing UK television planning model verification project. Read more here about the project we are working on (understanding location variability) and why it is important for TV white space future