We provide electromagnetic interference assessments
to assist developers meet LPA requirments regarding radio, television and other electromagnetic interference that may arise form building and construction work (tower cranes etc). The majority of this work is conducted in
London (City of Westminster in particular) and a typical requirment may
state;
to assist developers meet LPA requirments regarding radio, television and other electromagnetic interference that may arise form building and construction work (tower cranes etc). The majority of this work is conducted in
London (City of Westminster in particular) and a typical requirment may
state;
City of Westminster – Code of Construction Practice (CoCP), February 2022
3.15 ELECTROMAGNETIC INTERFERENCE
The developer’s nominated representative will consider the impacts of any electromagnetic interference on wireless telecommunication systems during the design and construction of the project. Technology should be used to prevent Radio Frequency Inference (RFI) where appropriate. Developers must also have regard for any potential adverse health impacts related to RFI. In the case of adverse impacts, the nominated representative will investigate, and if it is found to be linked to site activities, it must be resolved or, where this is not possible, mitigated.
The technical report compiled from the initial
desktop study and results of signal survey work will detail; the findings of the
site survey, technical interference discussion, any required
mitigation measures, and anything else required to meet the LPA’s need.
desktop study and results of signal survey work will detail; the findings of the
site survey, technical interference discussion, any required
mitigation measures, and anything else required to meet the LPA’s need.
Contact us on 01926 744771 to discuss your requirements